Projects

Commitment and performance

Pre-engineered building structures for Madina hypermarket

Client

City Nights Contracting

Completion Year

2017

Details

GEI completed the design, fabrication and supply of PEB steel structures of Madina hypermarket in Jebel Ali Industrial area Dubai. This is a trial project for GEI to obtain the PEB license from Dubai Municipality which has been granted in August 2017.

Pipe support structure for Dubai Water Canal

Client

Unknown

Completion Year

2016

Details

Gulf Engineering Industry contributed to the iconic Dubai Water Canal project. The piping for the waterfall cascading from the bridge that runs over the canal as part of Sheikh Zayed Road, is supported by a structure fabricated and erected by Gulf Engineering Industry. This structure is partially immersed in water at a depth of approximately 3 meters.

Next Generation school building

Client

Al Jihan Gulf Horizon General Contracting LLC

Completion Year

2016

Details

GEI has been awarded by Al Jihan Gulf Horizon General Contracting LLC of a project during the last quarter of 2015. The project is Construction of Next Generation School Building located at Al Barsha 3, Dubai-UAE. GEI’s scope of work includes Design, Supply and Fabrication of Hot-rolled Structural Steels including Decking sheets and Claddings. The Project is expected to be completed in May 2016.

HP flare knock-out drum and closed-drain vessel

Client

Aarya Engineering

Completion Year

2016

Details

Another on-going job awarded by Aarya Engineering for design, fabrication, and Supply of HP Flare Knock-out Drum-ID 1,290 T/T 3,040 mm (Shell-8 mm and DE-10 mm) and Closed Drain Vessel-ID 1,820 T/T 7,310 mm (Shell-10 mm and DE-12 mm). The final delivery with painting is expected to be done this May 2016.

TJF and Stub repair

Client

Dubai Aluminum

Completion Year

2016

Details

GEI has signed a contract with Dubai Aluminum for Fabrication of Transition Joint Repair and Aluminum Bar Straightening and Stub Repair from 2014 to 2016.

Fabricated Steel Silos

Client

Gulf Metal Foundry

Completion Year

2016

Details

One of GEI’s on-going projects is Gulf Metal Foundry’s Silos and Tank. The scope of work includes supply, fabrication and installation of Silo, supporting structures, platform, ladder and handrails; Supply, Fabrication and installation of MS Tank and supporting structures; and Supply, fabrication and installation of Propulsor Loading (160 Ø manual sand gate). The project is expected to finish by June 2016.

 

Pre-engineered office building

Client

City Nights Contracting LLC

Completion Year

2015

Details

A project for Pre-Engineered Building Structures has been awarded to GEI by City Nights Contracting LLC in 2014. It is an office building for M/s Textile Clothing International at SAIF Zone, Sharjah-UAE. The Scope of work for GEI is Design, Fabrication and Supply of PEB Steel Structures with epoxy paint finish and purlins. Additional structures for mezzanine floor of size 46×7.5m with stairs and handrails is also included .The job is completed in 2015.

Top Freight Logistics warehouse

Client

Al Quoz Contracting LLC

Completion Year

2014

Details

A project for Top Freight Logistics has been awarded to GEI in 2014 by the Al Quoz Contracting LLC. The scope of work is Supply, Fabrication, and Erection of Hot-rolled Structural Steels for the Proposed Warehouse shed of size 90m x 63m located at JAFZA, Dubai-UAE. The building is a multi-span type with intermediate column. The project has been completed in 2014.

Dual media filter vessel for water treatment

Client

Future Technologies

Completion Year

2014

Details

Future Technologies has awarded GEI a project for Alpha Water Treatment Plant for Supply and Fabrication of 6 units of Dual Media Filter Vessels of size ID 3.4M X 2M long (T/T) and of shell thickness 10mm and 3mm thick internal rubber lining. The project was completed in 2014.

Ahmed Abdullah Mohamed Bo Husain Al Flasi PEB warehouse

Client

Ideal Building Contracting

Completion Year

2014

Details

GEI’s new product, Pre-Engineered Building has been supplied, designed, and fabricated for a warehouse project for Ahmed Abdullah Mohamed Bo Husain Al Flasi in Sharjah, Industrial Area. The total area of the shed is 26m x 26m and was completed in 2014.

 

Dual media filter vessels

Client

Future Technologies

Completion Year

2013

Details

 

One of the big projects of Pressure Vessels from Future Technologies has been executed in 2013. GEI’s scope of works includes fabrication and supply of Six numbers of Dual Medial Filter Vessels of size ID 3.4m x 2m long (T/T) of shell thickness 10mm confirming to A36/S275JR and 3mm thick internal rubber lining.